Scotscape carried out the soft landscaping on this prestigious flagship Berkeley Development project over a 27 month period.
The works consisted of:
The project was multi-phased and logistically challenging as cranes were required to lift all materials and trees onto the podiums and tight schedules had to be followed, whist coordinating with the hard landscape teams.